What's Involved In Constructing A Path Or Driveway

What's Involved In Constructing A Path Or Driveway

Typically for a pathway, you would dig the area out to a depth of approximately 5 inches. A base of 3 inches of scalpings would then be laid and compacted. A weed control membrane is often laid over the scalpings and then the chosen chippings are laid to a depth of 1.5 – 2 inches.

With a driveway, a compacted base of scalpings is laid to a depth of 5 inches. A geotextile membrane is sometimes laid before the scalpings go down to suppress weeds and prevent rutting in the drive. Gravel is laid to a depth of about 2 inches. If gravel is laid deeper than this, cars tend to sink in leading to wheel spins.